PURPOSE: This technical note is part of a series collaboratively produced by the US Army Corps of Engineers (USACE)–Institute for Water Resources (IWR) and the US Army Engineer Research and Development Center (ERDC). It describes the funding and financing process for the South Bay Salt Pond Restoration Project in San Francisco Bay, California and, like the other technical notes in this series, documents successful examples of funding natural infrastructure projects. The research effort is a collaboration between the Engineering With Nature® (EWN®) and Systems Approach to Geomorphic Engineering (SAGE) programs of USACE. A key need for greater application of natural infrastructure approaches is information about obtaining funds to scope, design, construct, monitor, and adaptively manage these projects. As natural infrastructure techniques vary widely by location, purpose, and scale, there is no standard process for securing funds. The goal of this series is to share lessons learned about a variety of funding and financing methods to increase the implementation of natural infrastructure projects.

Date
2022-08