These 11" x 17" PDFs of the alternative maps and potential Phase 1 Actions were presented at the October 21st 2005 Stakeholder meeting. These maps are draft and will be changing in the near future, but are provided to encourage public review and discussion.
- Phase 1 Action Map (PDF)
Preliminary Program Alternatives
A program alternative is an integrated plan for habitat restoration, flood protection, and public access being considered for the Project.
- Revised Maps (July 13, 2005; revised since the Final memorandum)
- Final memorandum (January 21, 2005)
Philip Williams & Associates - Preliminary Alternatives Presentation (PDF, 0.6 MB, December 15, 2004)
by Michelle Orr, Philip Williams & Associates
Date
2005-10-19
Keywords