Habitat Evolution Continues. Photos by Cris Benton
Habitat Evolution Continues. Photos by Cris Benton
Date(s)
Thu, 06/21/2012, 1:00pm – 4:00pm
Wed, 08/17/2011, 1:00pm – 4:00pm
Thu, 09/23/2010, 1:00pm – 4:00pm
Thu, 02/07/2008, 1:00pm – 4:00pm
Wed, 06/06/2007, 1:00pm – 4:00pm
Description

June 21, 2012 Meeting

Meeting purpose: Present Shoreline Study partners’ tentatively selected plan for Alviso-area flood risk management (including levee alignments), ecosystem restoration and public trails, and gather input.

  • Meeting Outcomes (PDF)
  • Agenda (PDF)
  • Main Presentation (PDF)

August 17, 2011 Meeting

Meeting purpose: Present and gather input on potential alternatives for Shoreline Study flood protection levee alignments, ecosystem restoration and public trails.

  • Meeting Summary (PDF)
  • Alviso Update Presentation (PDF)
  • Flyer (PDF)
  • Agenda (PDF)

September 23, 2010 Meeting

  • Meeting summary (PDF)
  • Agenda (PDF)
  • Main Presentation (PDF)
  • Phase 2 Preliminary Options (PDF)
  • San Jose WPCP Plant Master Plan (PDF)

February 7, 2008 Meeting

  • Meeting Summary (PDF)
  • Agenda (PDF)
  • Main Presentation (PDF)
  • Phase 1 Applied Studies at A8 and E8A-9-8X (PDF)
  • A6 Restoration (PDF)
  • Phase 1 Applied Studies at Ponds SF2 & A16 (PDF)
  • Phase 1 Mercury Applied Studies at A8 and beyond (PDF)
  • Phase 1 Mercury Applied Study at A8 and Alviso Slough (PDF)

June 6, 2007 Meeting

  • Agenda (PDF)
  • Summary (PDF)
  • Main presentation ( PDF full quality | PDF quick download)
  • Draft charter (PDF)
  • Alviso Pond A6 Tidal Restoration Site Plan (PDF)
  • Alviso Pond A8 Phase I Restoration Plan (Summer Operation) (PDF)
  • Alviso Pond A16 Restoration Site Plan (PDF)
  • Shoreline Study Interim Feasibility Study Boundaries (PDF)
Location

San Jose Santa Clara Water Pollution Control Plant

 Google Map
Location Details
700 Los Esteros Rd
San Jose
CA